A.N.D Valves and Casting Solar Power Installation

A high-performance 111 kW solar energy project designed to deliver clean, reliable, and efficient power for Milky Mist at Thairpalayam, Erode.

Description

Site name

Milky Mist

Location

Thairpalayam, Erode

System Capacity

111 kW

A 111 kW solar power project at Milky Mist, Thairpalayam, Erode, designed to deliver reliable and efficient renewable energy with an estimated yearly output of 155,290 kWh.


 

Description

High-Efficiency Solar Technology

Bifacial N-Type PV modules with 615 Wp capacity designed for enhanced energy generation.

Reliable Energy Generation

A 111 kW solar installation delivering an estimated 155,290 kWh of electricity annually.

Advanced Power Management

Equipped with a BESS Module for efficient and reliable energy management.

Long-Term Reliability

The project includes a 10-year warranty, providing long-term confidence and support.

Description

Name Value 1 Value 2
Height 89" 56"
Depth 53" 66"
Weight 329 lbs. 221 lbs.
Electrical 118 VAC 110 VAC
Certifications AV CE

Description

Site name

Milky Mist

Location

Thairpalayam, Erode

System Capacity

111 kW

A 111 kW solar power project at Milky Mist, Thairpalayam, Erode, designed to deliver reliable and efficient renewable energy with an estimated yearly output of 155,290 kWh.


 

Description

High-Efficiency Solar Technology

Bifacial N-Type PV modules with 615 Wp capacity designed for enhanced energy generation.

Reliable Energy Generation

A 111 kW solar installation delivering an estimated 155,290 kWh of electricity annually.

Advanced Power Management

Equipped with a BESS Module for efficient and reliable energy management.

Long-Term Reliability

The project includes a 10-year warranty, providing long-term confidence and support.

Description

Name Value 1 Value 2
Height 89" 56"
Depth 53" 66"
Weight 329 lbs. 221 lbs.
Electrical 118 VAC 110 VAC
Certifications AV CE

Description

Site name

Milky Mist

Location

Thairpalayam, Erode

System Capacity

111 kW

A 111 kW solar power project at Milky Mist, Thairpalayam, Erode, designed to deliver reliable and efficient renewable energy with an estimated yearly output of 155,290 kWh.


 

Description

High-Efficiency Solar Technology

Bifacial N-Type PV modules with 615 Wp capacity designed for enhanced energy generation.

Reliable Energy Generation

A 111 kW solar installation delivering an estimated 155,290 kWh of electricity annually.

Advanced Power Management

Equipped with a BESS Module for efficient and reliable energy management.

Long-Term Reliability

The project includes a 10-year warranty, providing long-term confidence and support.

Description

Name Value 1 Value 2
Height 89" 56"
Depth 53" 66"
Weight 329 lbs. 221 lbs.
Electrical 118 VAC 110 VAC
Certifications AV CE
Our Projects
Get an Appointments

Project Overview

Site name

A.N.D Valves and Casting India Private Ltd

Location

Coimbatore

System Capacity

1 MW

A 111 kW solar power project at Milky Mist, Thairpalayam, Erode, designed to deliver reliable and efficient renewable energy with an estimated yearly output of 155,290 kWh.


 

Project Highlights

High-Efficiency Solar Technology

Installed with 615 Wp Bifacial N-Type PV Modules, designed to maximize solar energy generation and deliver enhanced performance.

Reliable Energy Generation

The 1 MW solar installation is designed to generate approximately 1,401,600 kWh of clean electricity annually, supporting the facility's energy requirements.

Advanced Power Management

Equipped with Sungrow SG125CX inverters, providing efficient power conversion and reliable solar energy management.

Long-Term Reliability

The project is backed by a 10-year warranty, providing long-term performance, reliability, and support.

Final Detailed Description

The A.N.D Valves and Casting India Private Ltd Solar Power Project is a 1 MW renewable energy installation designed to support efficient and sustainable power generation. The project uses advanced 615 Wp Bifacial N-Type PV modules along with Sungrow SG125CX inverters for reliable energy conversion and system performance.

Located in Coimbatore, the project commenced on 10th January 2026 and is expected to generate approximately 1,401,600 kWh of clean electricity annually, helping reduce dependence on conventional energy sources and supporting long-term sustainable energy goals.

Description

Massa lacinia pretium nec parturient conubia nostra senectus nibh nullam tempus dictumst. Ipsum ac primis sagittis eu magnis ornare hendrerit. Dignissim suspendisse libero aliquet urna hendrerit porttitor nisl nullam pharetra ut pretium. Ut lorem si torquent sem pellentesque ligula platea.

Massa lacinia pretium nec parturient conubia nostra senectus nibh nullam tempus dictumst. Ipsum ac primis sagittis eu magnis ornare hendrerit. Dignissim suspendisse libero aliquet urna hendrerit porttitor nisl nullam pharetra ut pretium. Ut lorem si torquent sem pellentesque ligula platea.

Key Featured

Conubia efficitur augue suspendisse duis libero per nam dignissim quis amet mauris. Eros sodales pulvinar mauris tortor inceptos cursus platea cubilia dui. Posuere senectus adipiscing libero rutrum eros mi augue vehicula tincidunt.
Get an Appointments